ARSC service for local authorities

Local Resilience and Civil Protection Strategy

Identify your community's vulnerabilities, set the priority measures and prepare the investments needed to protect the population and keep public services running.

Together with the local authority and the specialists involved, the Romanian Smart City Association (ARSC) prepares a diagnosis of existing risks and capacities, an action plan and a portfolio of prioritised projects. The analysis builds on the beneficiary's existing documents and initiatives.

For: town halls of communes

Three outcomes

A. Local diagnosis. The community's risks, vulnerabilities and capacities, based on existing documents and data, with the missing information identified.

B. Action plan. Prioritised measures, with responsibilities, a timeline and monitoring indicators.

C. Investment portfolio. Project sheets with justification, objective, indicative budget, maturity and the preparation stages that follow.

EU · Preparedness Union Strategy (March 2025)
EU · Niinistö report “Safer Together” (October 2024)
EU · Regulation (EU) 2025/1914 · cohesion and defence
RO · Government Decision (HG) 791/2024 · disaster risk reduction 2024-2035
RO · Law 481/2004 · civil protection
RO · HG 862/2016 · categories of buildings with shelters
RO · Law 294/2024 · resilience of critical entities
The problem it solves

From scattered documents to an investment decision

Risk data sits in documents produced in different years, by different services, for different purposes. The analysis brings them together into a single picture, from which the priorities and investments emerge.

1

Documents produced separately

The Risk Analysis and Coverage Plan (Planul de analiză și acoperire a riscurilor, PAAR), the emergency plans, the urban planning documentation and the asset registers each cover one piece. They have never been read together.

3

Essential services without a continuity plan

Water, energy, schools, social assistance, communications: what happens if they are interrupted, and how long the community can function without them.

4

Investments still to be prepared

An investment intention only goes into an application file once it has a written justification, an indicative budget and defined preparation stages.

What the local authority receives

A diagnosis, an action plan and an investment portfolio

The deliverables follow the same structure, whatever the size of the administrative-territorial unit (UAT).

1

Analysis of existing documents and data

An inventory of what already exists within the administration, identifying the information missing for a well-founded decision.

2

Diagnosis of local risks, vulnerabilities and capacities

The risks relevant to the territory, the community's weak points and the resources the administration actually has at its disposal.

3

Analysis of the continuity of essential services

The services that must function in any situation, their dependencies and the measures that keep them running.

4

Action plan with priorities, responsibilities, timeline and indicators

What is done, in what order, who is responsible, by when and how progress is measured.

5

Project sheets

For each proposed investment: justification, objective, indicative budget, maturity and the preparation stages that follow.

6

Analysis of possible funding sources and the applicable conditions

Which instruments may be considered for each project and which conditions must be met, as published at the date of the analysis.

7

Proposals for informing and preparing the population

Messages, channels and actions through which the administration can prepare residents for the situations identified in the diagnosis.

8

Monitoring tools and support for the review and approval process

Formats for tracking the plan and the materials needed to go through the beneficiary's internal procedures.

Status of the document. A document prepared for review and approval, in line with the procedures applicable to the beneficiary. The Strategy builds on and complements existing documentation, without replacing the Risk Analysis and Coverage Plan (PAAR) or other mandatory documents.

How we work

Five stages, with validation at every step

1

Defining the scope and collecting documents

What the analysis covers, which documents and data exist, who is responsible for communication.

2

Diagnosis and consultations

Analysis of the documents, discussions with the administration's services and with the specialists involved.

3

Prioritising measures and projects

Ranking the measures and investments against criteria agreed with the beneficiary.

4

Drafting, comments and revision

Drafting the document, the administration's comments and revision based on them.

5

Handover, training and support for approval

Handing over the materials, training the people involved and support for the review and approval process.

Timeline

The timeline is set in the proposal, depending on complexity, available data and the contracted activities. Institutional approval procedures follow a separate timeline.

What the beneficiary needs to provide

Four things without which the analysis stays theoretical

The quality of the diagnosis depends on access to the real information held by the administration.

A

A coordinating person

A single point of contact in the administration, who gathers the information and passes on comments.

C

Agreed access to staff and sites

Discussions with the services involved and visits arranged together, within the agreed limits.

D

Comments and interim validations

The administration's response at each stage, so that the final document is its own.

Frequently asked questions

Answers to the most common questions

For details, see the Strategy page and the Resources page, or write to us from the Contact page.

An analysis and planning document: the diagnosis of local risks, vulnerabilities and capacities, the analysis of the continuity of essential services, the action plan with priorities and indicators, the project sheets and the analysis of possible funding sources. It is handed over ready for review and approval, in line with the procedures applicable to the beneficiary.

Town halls of communes, towns and municipalities, Bucharest's sectors, county councils and intercommunity development associations, where their statutes allow this purpose. The document is not required by law; it serves administrations that want to put their risks and investments in order.

No. The Strategy builds on and complements existing documentation, including the Risk Analysis and Coverage Plan. It does not replace mandatory documents and does not take over the responsibilities of the emergency services.

The timeline is set in the proposal, depending on complexity, available data and the contracted activities. Institutional approval procedures follow a separate timeline.

No. The Strategy helps prepare the project portfolio. Eligibility and funding are verified for each project, against the conditions of the call. Project sheets do not replace feasibility studies, DALI (technical documentation for intervention works), expert assessments, technical designs, permits or funding applications.

The Romanian Smart City Association develops and coordinates projects and services for modernising public administration and developing smart communities. In this project, ARSC coordinates the analysis and planning, working with the administration and the specialists involved.

Next step: a 30-minute call

A 30-minute call, then a technical and financial proposal, contracting through the applicable procedure and the start of the project. Tell us who the contact person is and a convenient time.

Request a 30-minute call →

The Smart City Romania network, run by ARSC

Everything you need to know about Romania's fastest-growing industry

arsc.ro · [email protected]